Commercial / Civil / Demolition
ama Monitoring Services have everything you need to monitor commercial, civil and demolition projects.
Our technicians are well versed within live, complex construction sites under construction and redevelopment. We understand the compliance requirements put in place by government agencies, including Health, education, defence and RMS and can offer customised solutions to help meet your contractual conditions.
Project: Gosford Hospital Redevelopment Health & Wellbeing Precinct – Building A Base Build
Client: Richard Crookes Constructions
Services: Air Quality Monitoring
Richard Crookes Construction engaged ama Monitoring Services to monitor and validate the air quality during the bushfires burning heavily during December 2018 and January/February 2019. Due to a stringent delivery program, we installed an air quality monitor to determine the level of smoke and ash on-site. Our effort enabled workers to continue working on-site each day until the recorded unsafe PM2.5 limit. The monitor was effective as it allowed the workers to work in part for most days before the site shut down due to the smoke hazard. The closest local reporting station was over 40km away and was not an accurate indication of the site’s air quality.
Project: Wyong Hospital Redevelopment
Client: Richard Crookes Constructions
Services: Air Quality Monitoring, Noise Monitoring, Vibration Monitoring, Asbestos Monitoring, Asbestos Clearance, Asbestos Management, Waste Classification
Richard Crookes Constructions engaged ama Monitoring Services to provide environmental monitoring services for the Wyong Hospital Redevelopment Project. Our works consisted of dust, noise, and vibration during the Bulk Earthworks Stage and the acute hospital tower’s overall construction.
During this engagement, ama Monitoring Services also provided hygienist services to undertake classification and reporting of residual excavated soils that were to be removed from the site, NATA accredited and testing of material sampling of suspected hazardous materials, NATA water testing and reporting, airborne fibre monitoring during asbestos contamination removal and certification and clearances.
ama Monitoring Services were also readily available to attend the site and provide Professional Opinion Statements that were required throughout the project’s duration.
Project: Inverell Hospital Stage 1b
Client: Richard Crookes Constructions
Services: Asbestos Monitoring, Asbestos Management, Asbestos Compliance
Richard Crookes Constructions engaged ama Monitoring Services to undertake initial building inspections and testing to validate current LHD Hazmat reports before demolition contractor engagement.
Due to the potential friable asbestos present within the subfloor area and the ceiling spaces, ama’s rigorous approach and sound advice enabled a thorough investigation with no disruption to the adjacent ancillary hospital services.
Ama Monitoring Services enforced the use of personal protective equipment and controls required when sampling potentially asbestos-contaminated soils and materials.
Project: Gosford Hospital Redevelopment
Client: Lend Lease Building
Services: Asbestos Monitoring, Asbestos Management, Asbestos Compliance
Lend Lease engaged ama Monitoring Services to validate current LHD Hazmat reports during internal fit-out & refurbishment. We provided a hygienist on-site daily for asbestos, lead and dust monitoring requirements. Ama enforced the use of personal protective equipment and controls required when sampling potentially asbestos-contaminated soils and materials.
Project: Hornsby Hospital Redevelopment
Client: Delta Group
Services: Asbestos Monitoring, Asbestos Management, Asbestos Compliance
Delta Group engaged ama Monitoring Services during hazardous material removal, demolition and civil works. We provided a hygienist on-site daily for friable asbestos removal, lead and dust monitor set up.
ama Monitoring services enforced the use of personal protective equipment and controls required when sampling potentially hazardous asbestos-contaminated soils and materials.
Project: Blacktown Hospital Acute Mental Health
Client: Donnelley Constructions
Services: Air Quality Monitoring
Engaged by Donnelley Construction, ama Monitoring Services provided dust monitoring during internal demolition, strip out and a small portion of external
works. Due to the proximity of the live hospital environment behind adjacent walls and doors, the dust monitors were erected in high traffic locations, with alerts enabled to notify the site manager in a high dust reading event.
Project: Gosford Hospital Redevelopment Health & Wellbeing Precinct – Building A Fitout
Client: Richard Crookes Constructions
Services: Air Quality Monitoring
Richard Crookes Constructions engaged ama Monitoring Services for dust monitor installation during civil and landscape works. With a staff member living local to this project, we have provided efficient on-site assistance for waste classification and unidentified asbestos finds.
Project: The University of Newcastle – Honeysuckle City Campus Development (HCCD) Stage 1A
Client: Hansen Yuncken
Services: Noise Monitoring
Hansen Yuncken engaged ama Monitoring Services to undertaken attended noise monitoring in the vicinity of the construction site boundary at the closest noise sensitive receivers during various construction stages of the University of Newcastle – HCCD Stage 1A.
Attended noise monitoring was a requirement detailed in the projects Construction Noise and Vibration Management Plan. The reports produced by ama detailed the field calibration results, precise measurement times and dates, descriptions of the environment during the measurements and other contributing major noise sources. Hansen Yuncken would use the reports to close out the Development Application requirements.
Project: New Warnervale Public School
Client: Richard Crookes Constructions
Services: Air Quality Monitoring & Asbestos Monitoring
The new Warnervale Primary School was to be constructed on the footprint of the existing school, which was no longer in use. Richard Crookes Constructions engaged ama Monitoring Services to provide dust and asbestos monitoring during the Demolition, Bulk Earthworks and construction commencement Stages. ama Monitoring Services also regularly attended the site to provide professional advice during the demolition and bulk earthworks phases.
Project: Lindfield Learning Village
Client: Hindmarsh
Services: Asbestos Monitoring
Hindmarsh was required to complete one of Sydney’s largest refurbishment projects in a record 5 months. To achieve this, Hindmarsh engaged ama Monitoring Services to provide asbestos monitoring as the project was being delivered adjacent to an operational School campus and to protect the other subcontractors onsite while working within a contained asbestos environment and around the clock to finish this fast-tracked project.
Project: Canberra Airport Infrastructure Upgrade
Client: Global Utility Construction
Services: Waste classification of in-situ soils
Before commencing the infrastructure upgrade, works at the Canberra Airport Global Utility Construction were required to provide soil classification reports of
the residual soil where new inground infrastructure pits were installed. ama Monitoring Services were contacted and dispatched a team to attend the site, undertake the required soil tests and provide a decisive report that classified the soil and allowed works to commence.